KCL MEDICAL ENGINEERING CENTRE
The works comprised of strip-out, demolition and full fit-out of a Medical Engineering Facility on the 3rd floor of Lambeth House. The finished educational centre included state of the art lecture rooms, fully functional consultancy/training rooms and numerous study areas. The works required major modifications to the existing floor plan and include specialist building services and IT / BMS facilities.
-
Value:
£786,000
-
Client:
Kings College London
-
Architect:
Wilson Mason Partnership
-
Quantity Surveyor:
Northcroft