THE HEART HOSPITAL

This project involved the alteration and full refurbishment of nine existing wards between the third and fourth floors to provide five additional bed spaces over two phases which was completed on time in eight weeks. The works were carried out within a live ward environment and the MEC site team were highly praised by the Trust for their consideration towards staff, patients, clients and visitors and for also complying with strict noise, dust and infection control restrictions.

“I’m pleased to report that Phase 1 of the additional beds project at The Heart Hospital has been successfully handed over this morning.  MEC have worked tirelessly to handover this area on time and to a superb quality, with minimum amount of fuss and delay.....congratulations to Ross and the rest of the team from MEC” Riley Consulting

  • Value:

    £318,000

  • Client:

    University College London Hospital

  • Architect:

    Medical Architecture

  • Quantity Surveyor:

    Sweett (UK) Limited